Client:   David Parsons
Location:   Billericay, Essex
Year Completed:   2016
Value: £20k

Direct Piling have recently completed a piled raft foundation under the running cameras of Channel 4 TV programme Grand Designs. The 28 steel cased piles were driven into the ground and set to our engineers design set calculations at differing levels to suit the varying levels of the structural raft design for the house and art studio.

Experts In Groundworks

Reduce levelling and raft preparations followed including the timber perimeter and level change shuttering ready for the concrete to be boom pumped into position and finished. Direct Piling are delighted to have set the clients on their adventure and are looking forward to watching the programme in 2016.